Epic Engineering assisted Ashley Valley with the design and implementation of their new Storm Water Master Plan. Our team conducted the permitting, modeling and mapping for the system. This included detailed analysis of soils, geology, historic stream flows and channel flows.
As part of the Storm Water Master Plan, our team modeled the existing and future 10, 25, 50, 100 and 500-year flows and velocities. Our analysis included recommended improvements and population projection analysis, as well as detailed analysis of the existing storm drain system and future storm drain capacities.