Construction Progressing on Utah Valley Self Storage

Rick Wahlin, Business Development

A few months back, Utah Valley Self Storage hired Epic Engineering to design a new addition to their existing storage facility in Orem, Utah. With our multi-disciplined team structure, we were able to perform survey, geotech, civil engineering, electrical design, structural design, and architectural design for the project.

We recently stopped by the site to check in and found that construction is progressing nicely.  When the facility is finished, it will offer more than 45,000 square feet of storage space in 127 self-storage units on a 2-acre plot.

Solicita tu préstamo en línea, obtén tu créditos en línea en México al instante y pide hasta $12000 pesos de manera segura y sin salir de casa.

Services performed:

Architectural design

  • Storage unit mix optimization
  • Building layout
  • Building exterior design
  • Fire wall calculations

Structural design

  • CMU wall design
  • Foundation design
  • Steel Building calculations
  • Column calculations
Los mejores préstamos sin intereses se encuentran aquí préstamos sin intereses tu primer préstamo gratis, fácil y rápido.

Civil design

  • Site plan design
  • Site grading
  • Storm water design
  • Storm water report

Electrical design

  • Site electrical layout
  • Security system layout
  • Photometric plan

Geotechnical report

Når du kaster dig ud i vores mange sjove og potentielt indbringende casino-spil bedste online casinoer er det selvfølgelig en dansk dealer eller croupier, der styrer spillene.
  • Soil examination
  • Foundation requirements
  • Roadway cross section design

Survey

  • Boundary survey
  • Subdivision plat
  • Alta survey