Epic Engineering designed, bid and oversaw the construction of a 2 million gallon (MG) conventional concrete storage tank for Eagle Mountain, Utah. The partially buried, reinforced concrete tank included design and construction of a valve vault. Geotechnical, seismic, and rock slope excavation/stability analysis for construction site were also performed by Epic Engineering.