Epic Engineering’s team of experts designed the electrical line schematics for the Rio Tinto Stadium South Lot solar array. This impressive array produces around 2000 kW.
Our team was also in charge of reviewing all of engineering and architectural drawings for conformance with NEC standards. Our design team performed site visits to ensure that the drawings matched up with actual field conditions. As part of the design process, we performed calculations to check wire sizing and system voltage drop.
Our Construction Management team reviewed the finalized plans and specifications and found that the contractor needed to correct several issues that were not built to our design in order to be compliant with code.