Epic Engineering’s Civil Engineering team undertook a massive infrastructure project for Riverton city. Our experts designed and planned the drilling and construction of 2,000 gallon per minute (gpm) drinking water well to serve the city residents. The next phase of the project included the design and planning of a new concrete diversion structure on the Jordan River. This diversion structure design included physical and hydraulic modeling, as well as rating curves. The structure included a 4,000 gpm traveling water screen, automatic filtration, and all associated gates and valving.