Epic Engineering’s MEP Engineering team designed the Weatherford Wash Bay in Williston, North Dakota. This large 15,000 square foot wash bay consisted of radiant heat flooring, boilers, and mechanical systems. Our team designed the piping system, the pump, and provided all contract specifications, as well as heat loss calculations. Our Construction Management team then oversaw the building of the wash bay.