Epic Engineering’s MEP Engineering team designed the Weatherford Warehouse in Williston, North Dakota. This large 8,000 square foot warehouse consisted of radiant heat flooring, boilers, and mechanical systems. Our team designed the piping system, the pump, and provided all contract specifications, as well as heat loss calculations. Our Construction Management team then oversaw the building of the warehouse.