Epic Engineering’s Construction Management team partnered with Jordanelle Special Service District (JSSD) to oversee the construction a hydroelectric plant at the base of the Jordanelle Reservoir. Our team provided field and laboratory material testing services and ICC special inspection services. These services included testing of soils, aggregate, concrete, and special inspection of reinforced concrete.